Notes:
6/8/2021 9:59:38 AM
REMOVE ALL OF THE EXISTING MATERIALS IN THE KITCHEN. REMOVE THE WINDOW AND SLIDER IN THE DINING ROOM. REMOVE THE EXISTING LIGHTING IN THE KITCHEN. REMOVE THE FLOORING THROUGHOUT THE FIRST FLOOR AND APPLAINCES. REMOVE THE WALLS AS PER DRAWING. REMOVE THE ITEMS IN THE POWDER ROOM, REMOVE THE ITEMS IN THE LAUNDRY ROOM AND SALVAGE THE WASHER/DRYER. REMOVE THE BUMPOUT IN THE LIVING ROOM AND FIREPLACE. DISPOSE OF THESE MATERIALS. FRAME THE OPENING FOR THE NEW SLIDER- FRAME THE NEW WALLS AS PER DRAWING. FRAME THE NEW FIREPLACE OPENING. CRESS WILL PREPARE FIREPLACE OPENING. DEMO ELECTRICAL IN WALLS THAT WERE REMOVED. ELECTRICAL WORK FOR THE KITCHEN : DEMO EXISTING ELECTRICAL IN KITCHEN AS NEEDED FOR NEW LAYOUT. INSTALL NEW GFCI OULET ALONG THE COUNTERTOPS PER CODE. RUN SERVICE FOR APPLIANCES AT NEW LOCATIONS AS PER CODE. INSTALL NEW CAN LIGHTING IN THE KITCHEN AREA, (QTY 7) INSTALL A NEW CAN LIGHT OVER THE SINK. INSTALL ALL CAN LIGHTING ON A DIMMER. INSTALL NEW PUCK LIGHTS IN THE GLASS CABINETS IN THE KITCHEN AREA